1. DTP Failure
Select the step-> right click and select
“Display Message”-> there we will get the message which gives the reason for
ABEND.
A DTP can failure due to following reasons, in
such case we can go for restarting the job.
- System Exception Error
- Request Locked
- ABAP Run time error.
- Duplicate records
- Erroneous Records from PSA.
Duplicate records:
In
case of duplication in the records, we can find it in the error message along
with the Info Provider’s name. Before restarting the job after deleting the bad
DTP request, we have to handle the duplicate records. Go to the info provider
-> DTP step -> Update tab -> check handle duplicate records ->
activate -> Execute DTP. After successful competition of the job uncheck the
Handle Duplicate records option and activate.
DTP Log Run:
DTP Log Run:
- If a DTP is taking log time than the regular run time without having the back ground job, then we have to turn the status of the DTP into Red and then delete the DTP bad request (If any), repeat the step or restart the job.
- Before restarting the Job/ repeating the DTP step, make sure about the reason for failure.
- If the failure is due to “Space Issue” in the F fact table, engage the DBA team and also BASIS team and explain them the issue. Table size needs to be increased before performing any action in BW. It’ll be done by DBA Team. After increasing the space in the F fact table we can restart the job.
Erroneous Records from PSA:
When ever a DTP fails because of erroneous records,
while fetching the data from PSA to Data Target, in such cases data needs to be
changed in the ECC. If it is not possible, then after getting the approval from
the business, we can edit the Erroneous records in PSA and then we have to run
the DTP.
Go to PSA -> select request -> select error
records -> edit the records and save.
Then run the DTP.
2. INFO PACKAGE FAILURE:
The following are the reasons for Info Pack failure.
- Source System Connection failure
- tRFC/IDOC failure
- Communication Issues
- Processing the IDOC Manually in BI
- Check the source system connection with the help of SAP BASIS, if it is not fine ask them to rebuild the connection. After that restart the job (Info Pack).
Go to RSA1 -> select source system -> System
-> Connection check.
- In case of any failed tRFC’s/IDOC’s, the error message will be like “Error in writing the partition number DP2” or “Caller 01, 02 errors”. In such case reprocess the tRFC/IDOC with the help of SAP BASIS, and then job will finish successfully.
- If the data is loading from the source system to DSO directly, then delete the bad request in the PSA table, then restart the job
- Info Pack Long Run: If an info pack is running long, then check whether the job is finished at source system or not. If it is finished, then check whether any tRFC/IDOC struck/Failed with the help of SAP BASIS. Even after reprocessing the tRFC, if the job is in yellow status then turn the status into “Red”. Now restart / repeat the step. After completion of the job force complete.
- Before turning the status to Red/Green, make sure whether the load is of Full/Delta and also the time stamp is properly verified.
- Time Stamp Verification:
Select Info Package-> Process Monitor -> Header
-> Select Request -> Go to source System (Header->Source System) ->
Sm37-> give the request and check the status of the request in the source
system -> If it is in active, then we have to check whether there any
struck/failed tRFC’s/IDOC’s
If the request is in Cancelled status in Source system
-> Check the Info Pack status in BW system -> If IP status is also in
failed state/cancelled state -> Check the data load type (FULL or DELTA)
-> if the status is full then we can turn the Info Package status red and
then we can repeat/restart the Info package/job. -> If the load is of Delta
type then we have to go RSA7 in source system-> (Compare the last updated
time in Source System SM37 back ground job)) Check the time stamp -> If the
time stamp in RSA7 is matching then turn the Info Package status to Red ->
Restart the job. It’ll fetch the data in the next iteration
If the time stamp is not updated in RSA7 -> Turn
the status into Green -> Restart the job. It’ll fetch the data in the next
iteration.
Source System
|
BW System
|
Source System RSA7
|
Source System SM37
|
Action
|
I/P Status RED(Cancelled)
|
I/P Status (Active)
|
Time stamp matching with SM37 last updated
time
|
Time stamp matching with RSA7 time stamp
|
Turn the I/P Status into Red and Restart
the Job
|
I/P Status RED(Cancelled)
|
I/P Status (Cancelled)
|
Time stamp matching with SM37 last updated time
|
Time stamp matching with RSA7 time stamp
|
Turn the I/P Status into Red and Restart the Job
|
I/P Status RED(Cancelled)
|
I/P Status (Active)
|
Time stamp is not matching with SM37 last updated time
|
Time stamp is not matching with RSA7 time stamp
|
Turn the I/P status into Green and Restart the job
|
I/P Status RED(Cancelled)
|
I/P Status (Cancelled)
|
Time stamp is not matching with SM37 last updated time
|
Time stamp is not matching with RSA7 time stamp
|
Turn the I/P status into Green and Restart the job
|
- Processing the IDOC Manually in BI:
When there is an IDOC which is stuck in the BW and
successfully completed the background job in the source system, in such cases
we can process the IDOC manually in the BW.
Go to Info Package -> Process Monitor -> Details
-> select the IDOC which is in yellow status(stuck) -> Right click ->
Process the IDOC manually -> it’ll take some time to get processed.
Note: Make sure that we can
process the IDOC in BW only when the back ground job is completed in the source
system and stuck in the BW only.
3.
DSO Activation Failure:
When there is a failure
in DSO activation step, check whether the data is loading to DSO from PSA or
from the source system directly. If the data is loading to DSO from PSA, then
activate the DSO manually as follows
- Right click DSO Activation Step -> Target Administration -> Select the latest request in DSO -> select Activate -> after request turned to green status, Restart the job.
- If the data is loading directly from the source system to DSO, then delete the bad request in the PSA table, then restart the job
4.
Failure in Drop Index/ Compression step:
When there is a failure
in Drop Index/ compression step, check the Error Message. If it is failed due
to “Lock Issue”, it means job failed because of the parallel process or action
which we have performed on that particular cube or object. Before restarting
the job, make sure whether the object is unlocked or not
There is a chance of failure
in Index step in case of TREX server issues. In such cases engage BASIS team
and get the info reg TREX server and repeat/ Restart the job once the server is
fixed.
Compression Job may fail
when there is any other job which is trying to load the data or accessing from
the Cube. In such case job fails with the error message as “Locked by ......”
Before restarting the job, make sure whether the object is unlocked or not.
5. Roll Up failure:
“Roll Up” fails due to
Contention Issue. When there is Master Data load is in progress, there is a
chance of Roll up failure due to resource contention. In such case before
restarting the job/ step, make sure whether the master data load is completed
or not. Once the master data load finishes restart the job.
6. Change Run – Job finishes with error RSM 756
When there is a failure in the attribute change run
due to Contention, we have to wait for the other job (Attribute change run)
completion. Only one ACR can run in BW at a time. Once the other ACR job is
completed, then we can restart/repeat the job.
We can also run the ACR manually in case of nay failures.
Go to RSA1-> Tool -> Apply Hierarchy/Change Run -> select the
appropriate Request in the list for which we have to run ACR -> Execute.
7. Transformation
In-active:
In case of any changes in the production/moved to the production without
saving properly or any modification done in the transformation without
changing, in such cases there is a possibility of Load failure with the error
message as “ Failure due to Transformation In active”.
In such cases, we will have to activate the Transformation which is
inactive.
Go to RSA1 -> select the transformation -> Activate
In case of no authorization for activating the transformation in
production system, we can do it by using the program - RSDG_TRFN_ACTIVATE
Try the following steps to use the program
"RSDG_TRFN_ACTIVATE” here you will need to enter certain details:
Transformation ID: Transformation’s Tech Name
(ID)
Object Status: ACT
Type of Source: “Source Name”
Source name: “Source Tech Name”
Type of Target: Target Name
Target name: “Target Tech Name”
- Execute. The Transformation status will be turned into Active.
Then we can restart the job. Job will be
completed successfully.
8. Process Chain Started from the yesterday’s
failed step:
In few instances, process chain starts from the
step which was failed in the previous iteration instead of starting from the
“Start” step.
In such cases we will have to delete the previous
day’s process chain log, to start the chain form the beginning (from Start
variant).
Go To ST13-> Select the Process Chain ->
Log -> Delete.
Or we can use Function Module for Process Chain
Log Deletion: RSPROCESS_LOG_DELETE.
Give the log id of the process chain, which we
can get from the ST13 screen.
Then we can restart the chain.
Turning the Process Chain Status using Function
Module:
At times, when there is no progress in any of the
process chains which is running for a long time without any progress, we will
have to turn the status of the entire chain/Particular step by using the
Function Module.
Function
Module: RSPC_PROCESS_FINISH
The program "RSPC_PROCESS_FINISH" for
making the status of a particular process as finished.
To turn any DTP load which was running long, so
please try the following steps to use the program
"RSPC_PROCESS_FINISH" here you need to enter the following details:
LOG ID: this id will be the id of the parent
chain.
CHAIN: here you will need to enter the chain name
which has failed process.
TYPE: Type of failed step can be found out by
checking the table "RSPCPROCESSLOG" via "SE16" or
"ZSE16" by entering the Variant & Instance of the failed step.
The table "RSPCPROCESSLOG" can be used to find out various details
regarding a particular process.
INSTANCE & VARIANT: Instance & Variant name
can be found out by right clicking on the failed step and then by checking the
"Displaying Messages Options" of the failed step & then checking
the chain tab.
STATE: State is used to identify the overall
state of the process. Below given are the various states for a step.
R Ended with errors
G Successfully completed
F Completed
A Active
X Canceled
P Planned
S Skipped at restart
Q Released
Y Ready
Undefined
J Framework Error upon Completion (e.g. follow-on
job missing)
9. Hierarchy save Failure:
If
there is issues with Hierarchy save, we will have to schedule the Info packages
associated with the Hierarchies manually. Then we have to run Attribute Change
Run to update the changes to the associated Targets. Please find the below
mentioned the step by step process.
ST13->
Select Failed Process Chain -> Select Hierarchy Save Step -> Right click
Display Variant -> Select the info package in the hierarchy -> Go to RSA1
-> Run the Info Package Manually -> Tools -> Run Hierarchy/Attribute
Change Run -> Select Hierarchy List (Here you can find the List of
Hierarchies) -> Execute.
Thanks - Some nice tips here
ReplyDeleteThank you.. It is very much helpful
ReplyDeleteThank you so much
ReplyDeleteSAP BI is very good course to learn. Or if you are interested in SAP MM and FSCM the you go for sap mm online training | sap fscm online training in Hyderabad
ReplyDeleteGood information. In real time BASIC team creates IDOC type. Does abap team work on IDOC, if work what their work?Online SAP BI Training Classes
ReplyDeleteYour article is very informative, thanks for posting it...
ReplyDeleteSAP FICO Online Training | SAP MM Online Training
SAP BI BW Training Online!
ReplyDeleteHi I read your post very carefully and I think you are right that a well written post should be at least a 100 words and should capture the essence of your blog, book or article.
ReplyDeleteSAP SD Training in Chennai | SAP Training in Chennai
Hello, Thanks for sharing the inf about SAP Blog. We have more useful for us. Nice blog
ReplyDeleteSAP - Crystal Reports
Thank you for sharing your wonderful information. for professional graphics,
ReplyDeletework contacts me. I am a freelance designer in gurgaon.
Freelance Graphic Designing
Freelance Catalogue Designing in delhi
Freelance Catalogue Designing in gurgaon
Freelance Brochure Designing
Freelance Label Designing
Freelance Banner Designer
Freelance Poster Designer
graphic design services in delhi
graphic design services in gurgaon
Freelance Catalogue Designing in delhi
Freelance Catalogue Designing in gurgaon
Freelance Brochure Designing
Freelance Label Designing
Freelance Banner Designer
Freelance Poster Designer
graphic design services in delhi
graphic design services in gurgaon
freelance website designer in gurgaon
freelance designer in gurgaon
freelance website designer in gurgaon
freelance web designer in gurgaon
freelance graphic designer services in gurgaon
freelancer graphic designer services in gurgaon
freelancer graphic designer services in gurgaon
freelancer graphic services in gurgaon
freelancer logo services in gurgaon
freelancer logo services in gurgaon
freelancer web designer services in gurgaon
freelancer web designer services in gurgaon
freelance web designer services in gurgaon
freelance website designer services in gurgaon
freelance website designer services in gurgaon
freelance logo designer service in gurgaon
freelance logo designer service in gurgaon
logo designer in gurgaon
brochure design in gurgaon
logo design in gurgaon
freelance logo design in gurgaon
freelance logo designer in gurgaon
freelance logo designer in gurgaon
Nice blog
ReplyDeleteSAP Training in Chennai
Thanks for sharing this Information. SAP BI Training in Noida
ReplyDeleteThank you for your post. This is excellent information. It is amazing and wonderful to visit your site. And I would like to share some information about virtue solutions. www.virtuesolutionsonline.com
ReplyDeleteThanks for sharing this Information. SAP BI Institute in Gurgaon
ReplyDeleteThis site helps to clear your all query. ba exam time table 2021
ReplyDeletebsc 3rd year time table 2021 This is really worth reading. nice informative article.